| 1.
Choosing the Correct Container |
| 2.
Preparation before Fitting of Flexitanks |
Containers must be clean and free from from sharp edges or rough patches
Lining of corrugated paper before fitting the flexitank
Placing the flexitank right in the middle of the container. to open up the flexitank as per the folds
Positioning the laminated bulkhead across the coitainer door
Fitting of metal bars with cable ties on laminated bulkhead
Full view from inside container after fitting of bulkhead is completed
Warning labels to be pasted on left hand container door. This will give clear instructions on safety precautions
Container is now ready for loading operation
Remove the protection cover from the stubby
Connecting the stubby and hose for loading
Container is now ready for loading. Please take note that loading procedure using a stubby
is optional upon request
A complete view of a loaded container
Recommended pump used for loading and discharging operation
Container is now ready for discharging operation
Discharging operation in progress
Discharging procedure is complete
Removing of bulkhead is in progress. Upon the removal of bulkhead, the remaining residue can
still be squeezed out as shown in the next slide
Folding
the flexitank outwards and at the same time pressing the remaining residue
in the flexitank
Upon the completion
of the discharging, flexitank is being folded accordingly
Flexitank being packaged after the completion of the discharging
operation.